Electrical Rough-In:
All rough-in materials were donated by Williams Supply, Inc.;
All labor was donated my McGrady-Lambert Electric, Inc., Carter Electric and Peter Anderson |
|
|
|
|
|
|
HVAC Rough-In was on 3/11/06
A-1 Heating and Air donated all materials and labor |
|
|
|
The fire place that Paul Bowyer laid in the basement was saved, has been cleaned, and is ready to use. |
 |
March 30: Electrical rough-in is completed. Insulation has been installed.
|
| <-Framing and Roof |
Click to Enlarge |
|
|
|
|